Wingate Electrical PLC
Head Office: Wingate House
Rutherford Road, Basingstoke
Hants RG24 8QD
Telephone : 01256 330000
Facsimile : 01256 331202
INDUSTRIAL SERVICES
Heavy Industrial Projects made up of complex construction structures containing high technology plant and processes with challenging logistics of operation require dedicated Temporary Utility Services of the highest standard and quality starting with design through to installation, maintenance, testing and inspection and final removal of installations at the end of the construction and commissioning phases of a project.
Wingate have served Heavy Industrial Projects over the years with distinction, offering experienced management teams which integrate into our client’s management teams along with our skilled workforce and quality plant and equipment resulting in a “Get it Right First Time” culture with the highest standards of Health and Safety delivering projects on time and to budget.
Let Wingate take the TemporaryUtility Services logistical consideration away from you... so you can manage the rest.
Previous projects:
Connah’s Quay, North Wales.
Little Barford Power Station, Bedfordshire.
Marchwood Power Station, Southampton.
Chineham Power Station, Hampshire.
Ryehouse Power Station, Hertfordshire.
Staythorpe Power Station, Newark.
Current Projects:
Gwynt y Mor 576 MW Offshore Windfarm.
Stublach 400 cubic metre Underground Gas Storage Facility.
Ferrybridge 108 MW Multi Fuel Power Plant.
Wolverhampton 18 MW Energy From Waste Plant. Bicester 24 MW Energy From Waste Plant.
Ipswich 20 MW Energy From Waste Plant.
Exeter 3 MW Energy From Waste Plant.
Glenrothes 50 MW Biomass Power Plant. Runcorn 70 MW Energy From Waste Plant.
Billingham 21 MW Energy From Waste Plant.
Carrington 860 MW Energy Centre CCGT (Combined Cycle Gas Turbine) Power Station.
Courtauld Road MBT Facility, Basildon, Essex.